Value Engineering in building information modelling for cost optimization of renovation works

A case study

Fathoni Usman, Nur Adibah Jalaluddin, Sumi Amariena Hamim

Research output: Contribution to journalArticle

Abstract

Implementation of Value Engineering (VE) in the construction industry has become a proven technique for cost optimization. This paper presents a review of the implementation of BIM in construction industry. The factors that triggered and hinder the implementation of VE and BIM in the current industry and a case study of the application of VE using BIM for cost optimization of renovation works are also discussed. The project which was used for the case study is the renovation of shop lot units to be used as a student centre where student activities will be placed. 3D models of the project were developed as BIM model that provide strong visualization when creating alternatives for VE processes. The function analysis, risk analysis and life-cycle cost analysis were applied to determine the value index for each developed alternative. It shows that the implementation had successfully reduced the cost by approximately 27% and the value of the project increased after the process.

Original languageEnglish
Pages (from-to)431-435
Number of pages5
JournalInternational Journal of Engineering and Technology(UAE)
Volume7
Issue number4
DOIs
Publication statusPublished - 01 Jan 2018

Fingerprint

Value engineering
Construction Industry
Costs and Cost Analysis
Construction industry
Costs
Students
Risk analysis
Life Cycle Stages
Life cycle
Industry
Visualization

All Science Journal Classification (ASJC) codes

  • Biotechnology
  • Computer Science (miscellaneous)
  • Environmental Engineering
  • Chemical Engineering(all)
  • Engineering(all)
  • Hardware and Architecture

Cite this

@article{40d46f3239f5464fbf38862700129dcf,
title = "Value Engineering in building information modelling for cost optimization of renovation works: A case study",
abstract = "Implementation of Value Engineering (VE) in the construction industry has become a proven technique for cost optimization. This paper presents a review of the implementation of BIM in construction industry. The factors that triggered and hinder the implementation of VE and BIM in the current industry and a case study of the application of VE using BIM for cost optimization of renovation works are also discussed. The project which was used for the case study is the renovation of shop lot units to be used as a student centre where student activities will be placed. 3D models of the project were developed as BIM model that provide strong visualization when creating alternatives for VE processes. The function analysis, risk analysis and life-cycle cost analysis were applied to determine the value index for each developed alternative. It shows that the implementation had successfully reduced the cost by approximately 27{\%} and the value of the project increased after the process.",
author = "Fathoni Usman and Jalaluddin, {Nur Adibah} and Hamim, {Sumi Amariena}",
year = "2018",
month = "1",
day = "1",
doi = "10.14419/ijet.v7i4.35.22856",
language = "English",
volume = "7",
pages = "431--435",
journal = "International Journal of Engineering and Technology(UAE)",
issn = "2227-524X",
publisher = "Science Publishing Corporation Inc",
number = "4",

}

Value Engineering in building information modelling for cost optimization of renovation works : A case study. / Usman, Fathoni; Jalaluddin, Nur Adibah; Hamim, Sumi Amariena.

In: International Journal of Engineering and Technology(UAE), Vol. 7, No. 4, 01.01.2018, p. 431-435.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Value Engineering in building information modelling for cost optimization of renovation works

T2 - A case study

AU - Usman, Fathoni

AU - Jalaluddin, Nur Adibah

AU - Hamim, Sumi Amariena

PY - 2018/1/1

Y1 - 2018/1/1

N2 - Implementation of Value Engineering (VE) in the construction industry has become a proven technique for cost optimization. This paper presents a review of the implementation of BIM in construction industry. The factors that triggered and hinder the implementation of VE and BIM in the current industry and a case study of the application of VE using BIM for cost optimization of renovation works are also discussed. The project which was used for the case study is the renovation of shop lot units to be used as a student centre where student activities will be placed. 3D models of the project were developed as BIM model that provide strong visualization when creating alternatives for VE processes. The function analysis, risk analysis and life-cycle cost analysis were applied to determine the value index for each developed alternative. It shows that the implementation had successfully reduced the cost by approximately 27% and the value of the project increased after the process.

AB - Implementation of Value Engineering (VE) in the construction industry has become a proven technique for cost optimization. This paper presents a review of the implementation of BIM in construction industry. The factors that triggered and hinder the implementation of VE and BIM in the current industry and a case study of the application of VE using BIM for cost optimization of renovation works are also discussed. The project which was used for the case study is the renovation of shop lot units to be used as a student centre where student activities will be placed. 3D models of the project were developed as BIM model that provide strong visualization when creating alternatives for VE processes. The function analysis, risk analysis and life-cycle cost analysis were applied to determine the value index for each developed alternative. It shows that the implementation had successfully reduced the cost by approximately 27% and the value of the project increased after the process.

UR - http://www.scopus.com/inward/record.url?scp=85059236669&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85059236669&partnerID=8YFLogxK

U2 - 10.14419/ijet.v7i4.35.22856

DO - 10.14419/ijet.v7i4.35.22856

M3 - Article

VL - 7

SP - 431

EP - 435

JO - International Journal of Engineering and Technology(UAE)

JF - International Journal of Engineering and Technology(UAE)

SN - 2227-524X

IS - 4

ER -