Abstract

Rapid growth has resulted in increased storm water flow into receiving waters, with increases in flooding through drainage of storm water runoff from urban areas to receiving water bodies. The design philosophy of the conventional storm water drainage system was based on solving localized floods, either by transferring excessive flow in drainage systems downstream by upgrading the drainage system, or relieving localized problems by constructing storm overflows. In response to these issues there are needs for a paradigm shift in the way storm water is managed. There are various Best Management Practices (BMPs) techniques which can be used to control storm water runoff to achieve the target for water quality index similar to that before the development started. The artificial wetland system is part of the sustainable urban drainage system and this system has a main function in water quality improvement. The objective of this study was to determine the removal efficiency of contaminants in urban storm water by a wetland constructed in the Universiti Sains Malaysia (USM) Penang catchment. The result showed that the average removal efficiency of BOD was 9.7-80%, DO was 6.5-17.8%, turbidity was 25.9-30.0% and TP was 24-46%. In addition, strong positive correlations were found between water quality parameters at the inlet and water quality parameters at the outlet. However, a weak positive correlation between DO concentration at the inlet with BOD concentration at the inlet was identified throughout this study.

Original languageEnglish
Title of host publicationFloods
Subtitle of host publicationFrom Risk to Opportunity
Pages208-216
Number of pages9
Publication statusPublished - 09 Sep 2013
Event5th International Conference on Flood Management, ICFM 2011 - Tokyo, Japan
Duration: 27 Sep 201129 Sep 2011

Publication series

NameIAHS-AISH Publication
Volume357
ISSN (Print)0144-7815

Other

Other5th International Conference on Flood Management, ICFM 2011
CountryJapan
CityTokyo
Period27/09/1129/09/11

Fingerprint

wetland
pollutant
water
water quality
runoff
urban drainage
paradigm shift
best management practice
constructed wetland
tropical climate
turbidity
water flow
flooding
urban area
catchment
drainage
drainage system
parameter
removal

All Science Journal Classification (ASJC) codes

  • Earth and Planetary Sciences(all)

Cite this

Asmaliza, M. N. N., Mohd Sidek, L., Rozi, A., & Aminuddin, A. G. (2013). Performance of artificial wetland in removing contaminants from storm water under tropical climate. In Floods: From Risk to Opportunity (pp. 208-216). (IAHS-AISH Publication; Vol. 357).
Asmaliza, Mohd Noor Nur ; Mohd Sidek, Lariyah ; Rozi, A. ; Aminuddin, A. G. / Performance of artificial wetland in removing contaminants from storm water under tropical climate. Floods: From Risk to Opportunity. 2013. pp. 208-216 (IAHS-AISH Publication).
@inproceedings{c65dc7c978424dcaa93c9704d8602442,
title = "Performance of artificial wetland in removing contaminants from storm water under tropical climate",
abstract = "Rapid growth has resulted in increased storm water flow into receiving waters, with increases in flooding through drainage of storm water runoff from urban areas to receiving water bodies. The design philosophy of the conventional storm water drainage system was based on solving localized floods, either by transferring excessive flow in drainage systems downstream by upgrading the drainage system, or relieving localized problems by constructing storm overflows. In response to these issues there are needs for a paradigm shift in the way storm water is managed. There are various Best Management Practices (BMPs) techniques which can be used to control storm water runoff to achieve the target for water quality index similar to that before the development started. The artificial wetland system is part of the sustainable urban drainage system and this system has a main function in water quality improvement. The objective of this study was to determine the removal efficiency of contaminants in urban storm water by a wetland constructed in the Universiti Sains Malaysia (USM) Penang catchment. The result showed that the average removal efficiency of BOD was 9.7-80{\%}, DO was 6.5-17.8{\%}, turbidity was 25.9-30.0{\%} and TP was 24-46{\%}. In addition, strong positive correlations were found between water quality parameters at the inlet and water quality parameters at the outlet. However, a weak positive correlation between DO concentration at the inlet with BOD concentration at the inlet was identified throughout this study.",
author = "Asmaliza, {Mohd Noor Nur} and {Mohd Sidek}, Lariyah and A. Rozi and Aminuddin, {A. G.}",
year = "2013",
month = "9",
day = "9",
language = "English",
isbn = "9781907161353",
series = "IAHS-AISH Publication",
pages = "208--216",
booktitle = "Floods",

}

Asmaliza, MNN, Mohd Sidek, L, Rozi, A & Aminuddin, AG 2013, Performance of artificial wetland in removing contaminants from storm water under tropical climate. in Floods: From Risk to Opportunity. IAHS-AISH Publication, vol. 357, pp. 208-216, 5th International Conference on Flood Management, ICFM 2011, Tokyo, Japan, 27/09/11.

Performance of artificial wetland in removing contaminants from storm water under tropical climate. / Asmaliza, Mohd Noor Nur; Mohd Sidek, Lariyah; Rozi, A.; Aminuddin, A. G.

Floods: From Risk to Opportunity. 2013. p. 208-216 (IAHS-AISH Publication; Vol. 357).

Research output: Chapter in Book/Report/Conference proceedingConference contribution

TY - GEN

T1 - Performance of artificial wetland in removing contaminants from storm water under tropical climate

AU - Asmaliza, Mohd Noor Nur

AU - Mohd Sidek, Lariyah

AU - Rozi, A.

AU - Aminuddin, A. G.

PY - 2013/9/9

Y1 - 2013/9/9

N2 - Rapid growth has resulted in increased storm water flow into receiving waters, with increases in flooding through drainage of storm water runoff from urban areas to receiving water bodies. The design philosophy of the conventional storm water drainage system was based on solving localized floods, either by transferring excessive flow in drainage systems downstream by upgrading the drainage system, or relieving localized problems by constructing storm overflows. In response to these issues there are needs for a paradigm shift in the way storm water is managed. There are various Best Management Practices (BMPs) techniques which can be used to control storm water runoff to achieve the target for water quality index similar to that before the development started. The artificial wetland system is part of the sustainable urban drainage system and this system has a main function in water quality improvement. The objective of this study was to determine the removal efficiency of contaminants in urban storm water by a wetland constructed in the Universiti Sains Malaysia (USM) Penang catchment. The result showed that the average removal efficiency of BOD was 9.7-80%, DO was 6.5-17.8%, turbidity was 25.9-30.0% and TP was 24-46%. In addition, strong positive correlations were found between water quality parameters at the inlet and water quality parameters at the outlet. However, a weak positive correlation between DO concentration at the inlet with BOD concentration at the inlet was identified throughout this study.

AB - Rapid growth has resulted in increased storm water flow into receiving waters, with increases in flooding through drainage of storm water runoff from urban areas to receiving water bodies. The design philosophy of the conventional storm water drainage system was based on solving localized floods, either by transferring excessive flow in drainage systems downstream by upgrading the drainage system, or relieving localized problems by constructing storm overflows. In response to these issues there are needs for a paradigm shift in the way storm water is managed. There are various Best Management Practices (BMPs) techniques which can be used to control storm water runoff to achieve the target for water quality index similar to that before the development started. The artificial wetland system is part of the sustainable urban drainage system and this system has a main function in water quality improvement. The objective of this study was to determine the removal efficiency of contaminants in urban storm water by a wetland constructed in the Universiti Sains Malaysia (USM) Penang catchment. The result showed that the average removal efficiency of BOD was 9.7-80%, DO was 6.5-17.8%, turbidity was 25.9-30.0% and TP was 24-46%. In addition, strong positive correlations were found between water quality parameters at the inlet and water quality parameters at the outlet. However, a weak positive correlation between DO concentration at the inlet with BOD concentration at the inlet was identified throughout this study.

UR - http://www.scopus.com/inward/record.url?scp=84883351887&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84883351887&partnerID=8YFLogxK

M3 - Conference contribution

SN - 9781907161353

T3 - IAHS-AISH Publication

SP - 208

EP - 216

BT - Floods

ER -

Asmaliza MNN, Mohd Sidek L, Rozi A, Aminuddin AG. Performance of artificial wetland in removing contaminants from storm water under tropical climate. In Floods: From Risk to Opportunity. 2013. p. 208-216. (IAHS-AISH Publication).