Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

N. F. Md Said, Lariyah Mohd Sidek, Hidayah Basri, R. S. Muda, A. Z.Abdul Razad

Research output: Contribution to journalConference article

Abstract

Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

Original languageEnglish
Article number012018
JournalIOP Conference Series: Earth and Environmental Science
Volume32
Issue number1
DOIs
Publication statusPublished - 19 Apr 2016
Event2nd International Conference on Advances in Renewable Energy and Technologies, ICARET 2016 - Putrajaya, Malaysia
Duration: 23 Feb 201625 Feb 2016

Fingerprint

dam
safety
plan
mitigation
monitoring
responsibility

All Science Journal Classification (ASJC) codes

  • Environmental Science(all)
  • Earth and Planetary Sciences(all)

Cite this

@article{2fce1566f5284d69b5b87905645687f7,
title = "Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia",
abstract = "Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.",
author = "{Md Said}, {N. F.} and {Mohd Sidek}, Lariyah and Hidayah Basri and Muda, {R. S.} and Razad, {A. Z.Abdul}",
year = "2016",
month = "4",
day = "19",
doi = "10.1088/1755-1315/32/1/012018",
language = "English",
volume = "32",
journal = "IOP Conference Series: Earth and Environmental Science",
issn = "1755-1307",
publisher = "IOP Publishing Ltd.",
number = "1",

}

Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia. / Md Said, N. F.; Mohd Sidek, Lariyah; Basri, Hidayah; Muda, R. S.; Razad, A. Z.Abdul.

In: IOP Conference Series: Earth and Environmental Science, Vol. 32, No. 1, 012018, 19.04.2016.

Research output: Contribution to journalConference article

TY - JOUR

T1 - Introduction of an Emergency Response Plan for flood loading of Sultan Abu Bakar Dam in Malaysia

AU - Md Said, N. F.

AU - Mohd Sidek, Lariyah

AU - Basri, Hidayah

AU - Muda, R. S.

AU - Razad, A. Z.Abdul

PY - 2016/4/19

Y1 - 2016/4/19

N2 - Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

AB - Sultan Abu Bakar Dam Emergency Response Plan (ERP) is designed to assist employees for identifying, monitoring, responding and mitigation dam safety emergencies. This paper is outlined to identification of an organization chart, responsibility for emergency management team and triggering level in Sultan Abu Bakar Dam ERP. ERP is a plan that guides responsibilities for proper operation of Sultan Abu Bakar Dam in respond to emergency incidents affecting the dam. Based on this study four major responsibilities are needed for Abu Bakar Dam owing to protect any probable risk for downstream which they can be Incident Commander, Deputy Incident Commander, On-Scene Commander, Civil Engineer. In conclusion, having organization charts based on ERP studies can be helpful for decreasing the probable risks in any projects such as Abu Bakar Dam and it is a way to identify and suspected and actual dam safety emergencies.

UR - http://www.scopus.com/inward/record.url?scp=84966641691&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=84966641691&partnerID=8YFLogxK

U2 - 10.1088/1755-1315/32/1/012018

DO - 10.1088/1755-1315/32/1/012018

M3 - Conference article

VL - 32

JO - IOP Conference Series: Earth and Environmental Science

JF - IOP Conference Series: Earth and Environmental Science

SN - 1755-1307

IS - 1

M1 - 012018

ER -