Intelligent optimization systems for steam boiler maintenance: real case study

N. F.A. Fuzi, Firas Basim Ismail

Research output: Contribution to journalArticle

1 Citation (Scopus)

Abstract

The steam boiler plays an integral role in power plants. Most researcher detected that steam boiler in a power plant face an issue of a major outage. To avoid repetition of outage or failure, preventive maintenance scheduling also known as scheduled maintenance has been used widely in the power plant as an alternative based on the failure history of the equipment. However, the main issue plaguing scheduled maintenance is the redundancy of maintenance activities. Based on the selected adopted case study, we identified certain redundant activities in the scheduling. As a potential solution to this problem, the Analytic Hierarchy Process (AHP) and the Particle Swarm Optimization (PSO) are implemented to the adopted case study to optimize the maintenance operational duration and cost before implementing to the real case study.

Original languageEnglish
Pages (from-to)1749-1755
Number of pages7
JournalJournal of Advanced Research in Dynamical and Control Systems
Volume11
Issue number3 Special Issue
Publication statusPublished - 01 Jan 2019

    Fingerprint

All Science Journal Classification (ASJC) codes

  • Computer Science(all)
  • Engineering(all)

Cite this