Delay analysis of DBA using fuzzy logic for upstream EPON

Nurul Asyikin Mohamed Radzi, Norashidah Md. Din, Mohammed Hayder Al-Mansoori, Intan Shafinaz Mustafa, Mohd Shahmi Mohd

Research output: Chapter in Book/Report/Conference proceedingConference contribution

Abstract

In this paper, a delay analysis of Intelligent dynamic bandwidth allocation (IDBA) algorithm is studied. The algorithm is hierarchical, where fuzzy logic is used in the intra-optical network unit (ONU) to enhance the bandwidth utilization while reducing its delay. We compare the IDBA with the most referenced DBA algorithm, Hierarchical IPACT in terms of its delay and cycle time. The results show that IDBA reduce the delay up to 42% and the cycle time up to 44%.

Original languageEnglish
Title of host publication2010 International Conference on Photonics, ICP2010
DOIs
Publication statusPublished - 22 Nov 2010
Event2010 1st International Conference on Photonics, ICP2010 - Langkawi, Kedah, Malaysia
Duration: 05 Jul 201007 Jul 2010

Publication series

Name2010 International Conference on Photonics, ICP2010

Other

Other2010 1st International Conference on Photonics, ICP2010
CountryMalaysia
CityLangkawi, Kedah
Period05/07/1007/07/10

All Science Journal Classification (ASJC) codes

  • Electrical and Electronic Engineering

Fingerprint Dive into the research topics of 'Delay analysis of DBA using fuzzy logic for upstream EPON'. Together they form a unique fingerprint.

  • Cite this

    Radzi, N. A. M., Md. Din, N., Al-Mansoori, M. H., Mustafa, I. S., & Mohd, M. S. (2010). Delay analysis of DBA using fuzzy logic for upstream EPON. In 2010 International Conference on Photonics, ICP2010 [5604376] (2010 International Conference on Photonics, ICP2010). https://doi.org/10.1109/ICP.2010.5604376