A review of structural equation model for construction delay study

Mohd Zakwan Ramli, Marlinda Abdul Malek, Mohamad Zaki Muda, Zulkhairi Abd Talib, Nor Syahirah Azman, Nur Farah Syazana Mohamad Fu'ad, Mohd Hafiz Zawawi, Herda Yati Katman

Research output: Contribution to journalArticle

Abstract

Structural Equation Modelling (SEM) has been widely used in science social area compared to construction engineering and management field especially in area of delay construction. SEM is a second generation multivariate analysis that has an advance features compare to first generations of analysis tools. First generation techniques suffer with some assumptions such as error measurement is neglected, only observed variable allowed, only for simple model and other limitations. In construction delay study, comprehensive and complex analysis which involves hidden variables need to be considered to get precise results. Therefore, the main objective of this paper is to review the importance of applying SEM for construction delay study. Various papers which were taken from construction delay and construction management studies has been reviewed to observe the suitability of SEM for construction delay study. Outcome of this review reveals that SEM can include latent variable in the analysis model and consider of error measurement as integral part of the model as well as simultaneously analyse theory and measurement in a structural model while it is unobtainable for first generation techniques. This review proves that SEM can be an appropriate analysis tool for construction delay study.

Original languageEnglish
Pages (from-to)299-306
Number of pages8
JournalInternational Journal of Engineering and Technology(UAE)
Volume7
Issue number4
DOIs
Publication statusPublished - 01 Jan 2018

Fingerprint

Structural Models
Multivariate Analysis
Measurement errors
Social sciences

All Science Journal Classification (ASJC) codes

  • Biotechnology
  • Computer Science (miscellaneous)
  • Environmental Engineering
  • Chemical Engineering(all)
  • Engineering(all)
  • Hardware and Architecture

Cite this

Ramli, Mohd Zakwan ; Abdul Malek, Marlinda ; Muda, Mohamad Zaki ; Talib, Zulkhairi Abd ; Azman, Nor Syahirah ; Fu'ad, Nur Farah Syazana Mohamad ; Zawawi, Mohd Hafiz ; Katman, Herda Yati. / A review of structural equation model for construction delay study. In: International Journal of Engineering and Technology(UAE). 2018 ; Vol. 7, No. 4. pp. 299-306.
@article{e538ce6f699c4f1cba59140c97c1a12c,
title = "A review of structural equation model for construction delay study",
abstract = "Structural Equation Modelling (SEM) has been widely used in science social area compared to construction engineering and management field especially in area of delay construction. SEM is a second generation multivariate analysis that has an advance features compare to first generations of analysis tools. First generation techniques suffer with some assumptions such as error measurement is neglected, only observed variable allowed, only for simple model and other limitations. In construction delay study, comprehensive and complex analysis which involves hidden variables need to be considered to get precise results. Therefore, the main objective of this paper is to review the importance of applying SEM for construction delay study. Various papers which were taken from construction delay and construction management studies has been reviewed to observe the suitability of SEM for construction delay study. Outcome of this review reveals that SEM can include latent variable in the analysis model and consider of error measurement as integral part of the model as well as simultaneously analyse theory and measurement in a structural model while it is unobtainable for first generation techniques. This review proves that SEM can be an appropriate analysis tool for construction delay study.",
author = "Ramli, {Mohd Zakwan} and {Abdul Malek}, Marlinda and Muda, {Mohamad Zaki} and Talib, {Zulkhairi Abd} and Azman, {Nor Syahirah} and Fu'ad, {Nur Farah Syazana Mohamad} and Zawawi, {Mohd Hafiz} and Katman, {Herda Yati}",
year = "2018",
month = "1",
day = "1",
doi = "10.14419/ijet.v7i4.35.22750",
language = "English",
volume = "7",
pages = "299--306",
journal = "International Journal of Engineering and Technology(UAE)",
issn = "2227-524X",
publisher = "Science Publishing Corporation Inc",
number = "4",

}

A review of structural equation model for construction delay study. / Ramli, Mohd Zakwan; Abdul Malek, Marlinda; Muda, Mohamad Zaki; Talib, Zulkhairi Abd; Azman, Nor Syahirah; Fu'ad, Nur Farah Syazana Mohamad; Zawawi, Mohd Hafiz; Katman, Herda Yati.

In: International Journal of Engineering and Technology(UAE), Vol. 7, No. 4, 01.01.2018, p. 299-306.

Research output: Contribution to journalArticle

TY - JOUR

T1 - A review of structural equation model for construction delay study

AU - Ramli, Mohd Zakwan

AU - Abdul Malek, Marlinda

AU - Muda, Mohamad Zaki

AU - Talib, Zulkhairi Abd

AU - Azman, Nor Syahirah

AU - Fu'ad, Nur Farah Syazana Mohamad

AU - Zawawi, Mohd Hafiz

AU - Katman, Herda Yati

PY - 2018/1/1

Y1 - 2018/1/1

N2 - Structural Equation Modelling (SEM) has been widely used in science social area compared to construction engineering and management field especially in area of delay construction. SEM is a second generation multivariate analysis that has an advance features compare to first generations of analysis tools. First generation techniques suffer with some assumptions such as error measurement is neglected, only observed variable allowed, only for simple model and other limitations. In construction delay study, comprehensive and complex analysis which involves hidden variables need to be considered to get precise results. Therefore, the main objective of this paper is to review the importance of applying SEM for construction delay study. Various papers which were taken from construction delay and construction management studies has been reviewed to observe the suitability of SEM for construction delay study. Outcome of this review reveals that SEM can include latent variable in the analysis model and consider of error measurement as integral part of the model as well as simultaneously analyse theory and measurement in a structural model while it is unobtainable for first generation techniques. This review proves that SEM can be an appropriate analysis tool for construction delay study.

AB - Structural Equation Modelling (SEM) has been widely used in science social area compared to construction engineering and management field especially in area of delay construction. SEM is a second generation multivariate analysis that has an advance features compare to first generations of analysis tools. First generation techniques suffer with some assumptions such as error measurement is neglected, only observed variable allowed, only for simple model and other limitations. In construction delay study, comprehensive and complex analysis which involves hidden variables need to be considered to get precise results. Therefore, the main objective of this paper is to review the importance of applying SEM for construction delay study. Various papers which were taken from construction delay and construction management studies has been reviewed to observe the suitability of SEM for construction delay study. Outcome of this review reveals that SEM can include latent variable in the analysis model and consider of error measurement as integral part of the model as well as simultaneously analyse theory and measurement in a structural model while it is unobtainable for first generation techniques. This review proves that SEM can be an appropriate analysis tool for construction delay study.

UR - http://www.scopus.com/inward/record.url?scp=85059230788&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=85059230788&partnerID=8YFLogxK

U2 - 10.14419/ijet.v7i4.35.22750

DO - 10.14419/ijet.v7i4.35.22750

M3 - Article

AN - SCOPUS:85059230788

VL - 7

SP - 299

EP - 306

JO - International Journal of Engineering and Technology(UAE)

JF - International Journal of Engineering and Technology(UAE)

SN - 2227-524X

IS - 4

ER -